Drilling will not begin on the Interchange B Pad until Monday, 3/25. The drilling rig is being assembled on site.
Drilling will not begin on the Interchange B Pad until Monday, 3/25. The drilling rig is being assembled on site. Broomfield's inspectors will be conducting another site walk through on Friday, 3/22, once the drill rig is set up.