It is likely that the drilling rig will move onto the Interchange B Pad the evening of March 21. Extraction has been authorized by the COGCC to begin drilling the first well on the Interchange B Pad as soon as March 22.
It is likely that the drilling rig will move onto the Interchange B Pad the evening of March 21. Extraction has been authorized by the Colorado Oil and Gas Conservation Commission (COGCC) to begin drilling the first well on the Interchange B Pad as soon as March 22.
On March 20, 2019, Broomfield received a ‘Notice of Spud’ from the COGCC for 10 wells on the Interchange B Pad. Spud is a term used for the start of drilling. The well numbers and planned spud date included in the chart below.
