News Flash Home
The original item was published from 3/21/2019 6:59:26 PM to 3/22/2019 8:37:34 AM.

News Flash

Oil and Gas

Posted on: March 21, 2019

[ARCHIVED] Drilling Rig to Move Onto Interchange B Night of March 21

It is likely that the drilling rig will move onto the Interchange B Pad the evening of March 21. Extraction has been authorized by the COGCC to begin drilling the first well on the Interchange B Pad as soon as March 22.

It is likely that the drilling rig will move onto the Interchange B Pad the evening of March 21. Extraction has been authorized by the Colorado Oil and Gas Conservation Commission (COGCC)  to begin drilling the first well on the Interchange B Pad as soon as March 22.  

On March 20, 2019, Broomfield received a ‘Notice of Spud’ from the COGCC for 10 wells on the Interchange B Pad.  Spud is a term used for the start of drilling.  The well numbers and planned spud date included in the chart below.


Facebook Twitter Email